Bathroom remodeling in Bellevue

Bathroom Remodeling in Bellevue, WA

Bellevue Kitchen Remodeling Pros is King County's trusted expert in bathroom remodeling, specializing in walk-in shower installation, tub-to-shower conversion, and full en suite renovation. We offer wet room construction and custom vanity and bathroom cabinet fabrication.

Design and 3D planningSee it before you buy it
Fixed written proposalLine item, not a lump sum
In-house fabricationTemplate, cut and install

Free written estimate

Tell us about the project and we will get back to you the same business day.

Or call (940) 209-3977. Calls only, we do not receive text messages.
Licensed, insured and bonded in Washington State. No obligation, and no charge for the visit.

Kitchen project in Bellevue before the remodelThe same Bellevue kitchen after the remodelBeforeAfter

The finish standard we hold you to

Drag the handle across. These two frames are a kitchen project, shot from one camera position with no staging in between.

We show a kitchen here because tile setting, waterproofing and cabinet work are the same trades that build a bathroom, and this is the standard we hold on both. Ask at the estimate and we will walk you through bathroom work in person.

See the gallery

Our team provides tile design and shower waterproofing, delivering durable, long-lasting wet areas for homes and personalized bathroom solutions for both residential and commercial projects. Backed by a Washington State contractor license and general liability insurance, we take on work at every scale, from powder room refreshes to structural primary bath rebuilds.

From pressure-balanced valve rough-in and a shower floor pitched evenly to the drain, all the way to frameless glass and final hardware, our team handles every detail. Serving Bellevue and neighboring Mercer Island, Kirkland and Newcastle, we ensure fast, efficient service and deliver reliable, professional, beautiful results on every bathroom remodeling project.

Call (940) 209-3977 for a free in-home estimate. Most Bellevue appointments are booked within three business days.

What a Bellevue Bathroom Remodel Includes

A bathroom is the densest room in the house. Plumbing, electrical, ventilation, waterproofing and finish work all stack inside forty to a hundred square feet, and the order matters. A standard scope covers:

  • Demolition, disposal, floor protection and dust containment
  • Plumbing rough-in for supply, drain and vent, including the pressure-balanced valve that holds shower temperature steady when a toilet flushes elsewhere in the house
  • Electrical rough-in with GFCI protection, required in every US bathroom, plus IP44 rated fixtures and two light sources flanking the mirror at least a foot apart
  • Exhaust ventilation sized to the room
  • Waterproofing membrane across the shower walls and floor before any tile
  • Optional floor heat, resistive electric mats or radiant hot water tubing
  • Tile setting, grout and sealing
  • Vanity, bathroom cabinets, vanity top and sink
  • Toilet, tub, bidet, towel bars and accessories
  • Shower enclosure: curtain, sliding door, folding door or frameless glass
  • Paint, trim, final clean and walkthrough

Bellevue averages 32.02 inches of rain a year in a mild oceanic climate. That moisture load is why we treat waterproofing as structural rather than optional. A beautiful tile job over a poor membrane fails from behind, and you do not see it until the drywall below goes soft.

Every Kind of Bathroom We Remodel

The room type decides the budget, the permit path and the plumbing, so start here rather than at the tile.

Primary and en suite baths. The largest bath in the house, reached only from the bedroom. See master bathroom remodeling in Bellevue, or luxury master bathroom renovation when the program runs to a steam shower and book-matched stone.

Hall, guest and family baths. The full bath that opens onto a corridor and serves everyone. Details on our guest and hall bathroom remodeling page.

Small baths and 3/4 baths. Toilet, sink and shower in a tight footprint. Read small bathroom remodeling for the moves that actually buy space.

Half baths and powder rooms. Toilet and sink only, no wet area at all, which makes them the cheapest room in the house to make memorable. See half bath and powder room remodeling.

Jack-and-Jill baths. A bath sitting between two bedrooms and shared through two doors. Our Jack-and-Jill bathroom remodeling page covers the privacy and compartment planning these need.

Everything else on the Eastside. Condo bathroom remodeling for Downtown towers with stacked plumbing and HOA rules, accessible and aging-in-place bathrooms for zero-threshold entries and grab blocking, bathroom layout reconfiguration when the fixtures are in the wrong places, wet room conversion for a fully waterproofed open room with the floor sloped to a single drain, bathroom additions when the house is short a bath entirely, basement bathroom remodeling where drainage sits below the sewer line, and historic and vintage bathroom renovation for the 1950s and 1960s houses around Lake Hills and Woodridge worth restoring rather than gutting.

Bathroom Remodel Cost in Bellevue

These are honest 2026 ranges for the Seattle and Eastside market, not a quote. Your number comes from a site visit.

ScopeTypical Bellevue rangeWhat it covers
Cosmetic or surface-level refresh$18,000 to $35,000Fixtures, vanity, tile and paint on the existing layout
Tub-to-shower conversion$15,000 to $30,000Remove the tub, build and waterproof a shower pan, tile, new valve and glass
Walk-in shower installation$18,000 to $40,000Curbless or low-curb shower, membrane, bench, niche, frameless enclosure
Hall bath, 45 to 65 sq ft$22,000 to $35,000Full replacement of a corridor bath, same footprint
Moderate primary bath$40,000 to $75,000New layout within the existing walls, double vanity, separate shower
Primary bath, 90 to 120 sq ft$55,000 to $85,000Full rebuild with upgraded tile, cabinetry and glass
Major structural primary$75,000 to $150,000+Walls moved, plumbing relocated, footprint changed
Luxury structural, 150 to 200+ sq ft$150,000 to $250,000+Steam, wet room, natural stone program, radiant heat

What moves the number:

  • Layout changes. Keeping the toilet, sink and shower where they are is the single biggest saving available on any bathroom.
  • Plumbing relocation. Moving a drain means opening the floor. On a second-story bath over a finished ceiling, that is two rooms of work for one fixture.
  • Home age. Bellevue has 64,688 housing units, and plenty of the stock in Newport, Lake Hills and Crossroads predates the mid-1970s. Galvanized supply, undersized panels and out-of-square framing surface the moment the tile comes off.
  • Waterproofing system. Sheet membrane, liquid-applied and foam board systems differ in cost and labor hours. We specify the system in writing.
  • Cabinetry quality. A frameless vanity built to the actual wall costs more than a stock box and fits a 1968 bathroom far better.
  • Material specification. Ceramic field tile and engineered quartz at one end. Natural stone mosaic, zellige and marble slab at the other.

How a Bathroom Project Runs

  1. Free in-home estimate. We measure, check the valve, the vent and the panel, and talk budget before anyone draws anything.
  2. Design and selections. Layout, tile, fixtures and vanity top, with allowances written into the proposal rather than discovered in week three.
  3. Permits. Moving plumbing or electrical requires a City of Bellevue permit. We pull and manage it.
  4. Demolition. One to three days, with containment at the door.
  5. Rough-in and inspection. Plumbing and electrical go in, then the inspector signs off before anything closes up.
  6. Waterproofing and flood test. Membrane installed, drain sealed, pan filled and held to confirm it holds water.
  7. Tile. The longest single phase, and the one that decides how the room reads.
  8. Cabinets, tops, fixtures and glass. Glass is measured after tile, never before.
  9. Paint, trim, punch list and final walkthrough.

Three to six weeks on site for most Bellevue bathrooms. Structural primary baths run eight to twelve. Frameless glass fabrication alone adds two to three weeks after template.

Tile, Waterproofing and Vanity Tops

Tile. Glazed ceramic is the workhorse for interior walls. Porcelain is denser and takes floor traffic. Natural stone, marble, onyx, granite and slate, is less uniform in color and pattern, so it needs more planning and more layout time on site before a single sheet is set. Glass, metal, terracotta, mosaic and zellige each behave differently under a trowel. Encaustic tile carries its pattern through the full thickness of the body, so the design does not wear away in a hall bath that sees three showers a day.

Layout changes the room as much as material does. Herringbone and chevron pull the eye along a narrow floor. Staggered and offset settings forgive an out-of-plumb wall. Stacked and grid layouts are unforgiving and look superb when the framing is true. Basket weave, pinwheel and diagonal read as period-appropriate in older Eastside homes.

Showers. A stall shower with a door or curtain is the standard. A wet room removes the raised area and slopes the whole floor to a drain. A steam shower needs a humidifying steam generator and a sealed enclosure. Showerheads come fixed, handheld, ceiling-mounted or adjustable spray, and we plumb for the heads before the tile, not after.

Vanity tops. Engineered quartz is roughly 93% aggregate and 7% resin and never needs sealing. Granite and marble do. Cultured marble, polyester resin cast with marble dust, tests about four times stronger than natural granite or marble and remains the value pick for a secondary bath. Solid surface runs about 12mm thick, accepts an integrated sink and sands to a nearly invisible joint.

Cabinetry. Frameless European construction gives you the full drawer opening. Face frame adds a frame about an inch and a half across the front and hides wall irregularity in older houses. MDF is the right substrate under paint because it stays flat in a humid room. Maple, oak, cherry, birch and alder are the stain-grade species.

Related Services

Running a bathroom and a kitchen in the same window shares the demo, the permit and the finish passes, which is why a full kitchen remodel is the pairing we quote most. Replacing vanity tops and kitchen counters together? See kitchen countertop replacement. Kitchen and bath 3D design planning puts renderings in your hands before anything is ordered. Our Bellevue remodeling home page carries the full service list.

Areas We Serve

We remodel bathrooms across Bellevue: Downtown, West Bellevue, Northwest Bellevue, Northeast Bellevue, Bridle Trails, Crossroads, Lake Hills, Somerset, Woodridge, Newport, Eastgate, Factoria, Wilburton, BelRed, West Lake Sammamish, Cougar Mountain and Lakemont, ZIP codes 98004 through 98009.

We also take bathroom projects in Mercer Island, Kirkland, Redmond, Sammamish and Issaquah, plus Medina, Clyde Hill, Hunts Point, Yarrow Point, Newcastle and Renton. Interstate 405, Interstate 90 and State Route 520 keep nearly all of it inside a twenty minute drive.

Why Bellevue Homeowners Choose Us

One crew, one accountability line. Plumbing, waterproofing, tile and glass stay with us. A leak is never a dispute between two subcontractors.

We flood test every pan. Before tile. It costs a day and it prevents the failure that costs a ceiling.

Licensed and insured. a Washington State contractor license and general liability. Certificates go out before work starts.

Written change orders. Priced and signed before the work happens, not explained afterward.

We protect the house. Containment at the door, floor protection on the path in, and a broom-clean site every evening. You live in the rest of the house while we work in one room of it.

Frequently Asked Questions

Straight answers, from the questions we get asked at the estimate.

How much does a bathroom remodel cost in Bellevue?

A cosmetic refresh runs $18,000 to $35,000. A hall bath of 45 to 65 square feet is $22,000 to $35,000. A primary bath of 90 to 120 square feet runs $55,000 to $85,000, and structural work pushes past $150,000.

How long will my bathroom be out of use?

Three to six weeks on site for most bathrooms, eight to twelve for a structural primary bath. If it is your only full bath, we will phase the work to shorten the window.

Do you offer free estimates?

Yes. Free in-home estimates with no obligation, usually scheduled within three business days. Call (940) 209-3977.

Do I need a permit for a bathroom remodel in Bellevue?

Like-for-like fixture swaps usually do not. Moving a drain, adding circuits or altering a wall does. We pull City of Bellevue permits inside the contract.

Is a tub-to-shower conversion worth it?

In a primary bath, almost always. In a house where it would leave no tub at all, weigh resale first. Conversions run $15,000 to $30,000.

Do you serve my ZIP code?

Bellevue 98004 through 98009, Mercer Island 98040, Kirkland 98033 and 98034, Redmond 98052 and 98053, Sammamish 98029, 98074 and 98075, and Issaquah 98027.

Can you do heated floors?

Yes. Resistive electric mats are the common choice on a remodel. Radiant hot water tubing makes sense when the house already has a hydronic system.

Are you licensed and insured?

a Washington State contractor license and general liability, with certificates available on request before work begins.

What warranty comes with the work?

Workmanship is covered by a written workmanship warranty. Manufacturer warranties on fixtures, tile, cabinetry and glass pass through to you, and the terms are printed in the contract.

Can I live at home during the remodel?

Yes, and most clients do. We seal the work zone and schedule water shutoffs with you rather than at you.

Get a Free Bathroom Remodel Estimate in Bellevue

We will measure the room, check the valve, the vent and the panel, and hand you a written, itemized number with the allowances spelled out in plain English.

26Services
2Trades under one contract
1Site lead per project
0Subcontractor handoffs

Free written estimate

Tell us about the project and we will get back to you the same business day.

Or call (940) 209-3977. Calls only, we do not receive text messages.
Licensed, insured and bonded in Washington State. No obligation, and no charge for the visit.

Call (940) 209-3977Free Estimate